Skip to content

Concepts

Commands, batches and revisions

How an edit is a batch of named operations, how revisions protect against stale plans, and how to retry safely.

Last updated:

The idea#

An edit is a batchA list of edits sent together and applied as one step.: a list of operations, each one a named command such as track.add or item.move, with its arguments. The whole batch applies or none of it does, and it becomes one revisionA number that goes up by one every time the project is changed. and one undo step.

Every batch names the base_revision it was planned against. If the project moved on, the batch is replayed on the newer revision unless it touches objects another actor changed; then it answers E_REVISION_CONFLICT with a text diff of what changed, so you can read it and plan again.

Quick start#

  1. Read the revision: project_get, or the revision of your last edit result.
  2. Send the batch with that base_revision. Give a new track or item your own id when a later operation in the same batch refers to it.
  3. Use dry_run: true to check a batch without saving it.
  4. Use an idempotency_key when you may retry: the same key with the same batch returns the first result, with replayed: true. The same key with a different batch is E_IDEMPOTENCY_MISMATCH.

The operations are in the operations of the edit tool.

Going back: revert, checkpoints and the diff#

The history is never rewritten, so going back is one more revision.

  • Checkpoints name a revision ("before the intro"): in the History sidebar, with stuarty checkpoint:create, or with history action=checkpoint. Removing a checkpoint never removes a revision. Before an agent's first edit of the day the service makes one by itself, so there is always a point to come back to.
  • The diff says in words what changed between two revisions, most significant first: stuarty diff --project <id> --from 12, or history action=diff. It is computed from the two documents, so it is right after undo and redo too.
  • Revert takes the project back to the document at a revision or a checkpoint, as a new revision of whoever asked: stuarty revert --project <id> --checkpoint "before the intro" --dry-run shows what it would change and writes nothing. Without --dry-run it is a step like any other, and undo takes it back. A revert goes over what other actors did since, on purpose; with an older --base it answers E_REVISION_CONFLICT instead when they changed an object it would change.
  • Images have the same three, with the same rules: in the history panel of the image editor (name a version, read the changes since a revision, "revert to here" with the dry run as the confirmation), with stuarty image:checkpoint:create, stuarty image:diff and stuarty image:revert and the id of the image as the first argument, or with history domain=image and its image_id.

Common mistakes#

  • Sending a base_revision ahead of the project: E_VALIDATION.
  • Retrying a conflict unchanged. Read the diff first.

Next steps#